Should a business put commercial solar on the roof or on the ground?

What each option costs, what it needs, and which planning route it takes, with a dated source for every figure.

Written by Harry HainesCEO & Co-Founder, CH Group Updated · 9 min read

CH Group runs controlled solar tenders for commercial sites of 100 kWp and above.

A UK warehouse with solar panels on its roof beside an empty grassed field enclosed by a plain green security fence, in soft evening light

The short answer

For a business with a sound roof, rooftop solar is usually the cheaper and quicker route. Two commercial installers put ground mount 15 to 30 and 15 to 20 percent above rooftop per kWp 410. Commercial rooftop solar in England is usually permitted development with 56 days of prior approval 2, while a business-scale ground array needs a full planning application, because only the first stand-alone array of up to 9 square metres is permitted development 14.

A ground mount suits a site with spare land and more daytime demand than the roof can serve. Installers report about 10 to 20 percent more output per kWp from a ground array, and the European Commission's PVGIS tool shows the gain depends on the roof, from about 1 to 21 percent 41013, but it needs land, roughly 2.5 to 4 acres per MWp on one installer's figure 4, and government planning policy prefers brownfield and lower-quality land 5. Payback depends more on how much of the power you use on site than on how the panels are mounted 4. A solar canopy over off-street parking can be permitted development in England within limits 3, and suits a site with parking and a weak or full roof.

Figures checked

Key numbers

Key numbers
FigureSource
Planning for a stand-alone ground array in the grounds of a non-domestic buildingOnly the first array is permitted development, up to 9 square metres (3 m by 3 m), 4 m high and 5 m from the boundaryPlanning Portal, accessed 16 Nov 2026 1
Planning for panels on a non-domestic roofPermitted development, with 56 days of prior approval for PV that is not microgenerationPlanning Portal, accessed 16 Nov 2026 2
Ground mount cost premium over rooftop, per kWp15 to 30 percent (EvoEnergy); 15 to 20 (R&B); 10 to 20 (Midland Solar); 15 to 35 (Greener Solar Solutions)Four unrelated installers, 2025 to 2026 4101112
Ground mount output against rooftop, per kWpInstallers: 10 to 20 percent (EvoEnergy), about 10 (R&B). PVGIS, central England: about 1 to 21 percent, depending on the roofEvoEnergy, R&B; JRC PVGIS, run 16 Nov 2026 41013
Land for a ground mountRoughly 2.5 to 4 acres per MWp (installer); about 5.6 acres per MW in a government example (20 acres for 3.6 MW)EvoEnergy 4; DESNZ Solar Roadmap, 30 Jun 2025 5
Business rates exemption for on-site renewable plant, England1 April 2022 to 1 April 2035, where most of the power is used on site; the land stays rateableVOA, updated 6 Nov 2026 6

What goes wrong when you pick roof or ground first, and what does it cost?

The usual mistake is to pick roof or ground before testing the four things that decide it, so the board approves a design that the roof, the land, the planning rules or the grid will not support.

One installer says the choice comes down to four things: what your roof can carry, what land you can spare, how much electricity you use during daylight hours, and what your grid connection will allow 4. Skip one of them and the problems show up late.

  • Assuming a ground mount avoids the roof problem. A ground array needs land, a full planning application and groundworks of its own. The same installer lists roof age, structural capacity and remaining lease term as the three most common reasons a roof is ruled out 4. Our site suitability guide covers the roof checks.
  • Assuming a ground array is permitted development. Only the first stand-alone array in the grounds of a non-domestic building, up to 9 square metres, is permitted development 1. An installer states that in almost all commercial cases a ground mount needs a full planning application 4.
  • Sizing for the land, not for the demand. A larger ground array exports more of what it generates. Payback is driven by your self-consumption rate more than by the mounting method 4. See our payback guide.
  • Forgetting the business rates on the land. The exemption covers the plant, not the land that holds it 6.
  • Treating the grid as the installer's problem. Either option needs a G99 application to the network operator, and its offer standard is 45 or 65 working days 7. See how long commercial solar takes.

The cost is a design that has to be changed after the board has approved it, or a delay while a planning application runs.

Does a roof array or a ground array need planning permission?

A roof array on a non-domestic building is usually permitted development with prior approval, a ground array above 9 square metres needs full planning permission, and a solar canopy over off-street parking has its own permitted development limits.

The table covers England. The Planning Portal's guidance is introductory and not legal advice, and local rules can also apply 123. Planning rules differ in Wales, Scotland, Northern Ireland and Ireland, so check with your local planning authority.

Planning route for a roof array, a ground array and a car park canopy (England)
OptionPlanning routeKey limitsSource
Roof of a non-domestic buildingPermitted development; 56 days of prior approval for PV that is not microgenerationNo more than 200 mm from a pitched roof; no more than 1 m above a flat roof; at least 1 m from the roof edge; not on a listed buildingPlanning Portal 2
Ground, in the grounds of a non-domestic buildingOnly the first stand-alone array is permitted development; further arrays need planning permissionArray no more than 9 square metres (3 m by 3 m); no more than 4 m high; at least 5 m from the boundary; not within a listed building or scheduled monumentPlanning Portal 1
Solar canopy over off-street parkingPermitted development within limitsNo more than 4 m high; more than 10 m from the curtilage of a dwelling or block of flats; not in the curtilage of a listed building; run-off directed to a permeable area where it appliesPlanning Portal 3

Government policy also shapes ground mount applications. The Solar Roadmap says planning policy and guidance for England is clear that, wherever possible, developers should use brownfield, industrial, contaminated or previously developed land, and that using best and most versatile agricultural land (grades 1, 2 and 3a) has to be justified 5. On our reading, that favours the roof or a canopy where either is possible.

How do cost, output and land compare?

Rooftop is usually cheaper per kWp and needs no land, a ground mount usually produces more per kWp and scales across available land, and the sources do not agree on how much land a ground mount needs.

These figures are installer claims, not an independent survey, and most come from one published guide (EvoEnergy). The cost row uses four unrelated installers, the first two commercial and the last two writing mainly for home and farm buyers. The output row adds the European Commission's PVGIS tool. Treat them all as a starting point to test in quotes. The sources used here give no per-kWp figure for car park canopies, so ask installers to price one separately.

Roof and ground mount compared on installer figures
FactorCommercial rooftopGround mountSource
Cost per kWpLowerGround mount costs more: 15 to 30 percent (EvoEnergy), 15 to 20 (R&B), 10 to 20 (Midland Solar), 15 to 35 (Greener Solar Solutions); EvoEnergy says the gap narrows at larger scaleEvoEnergy 4; R&B 10; Midland Solar 11; Greener Solar Solutions 12
Output per kWpSet by roof pitch and orientation; east-west flat roof arrays give less per kWp but a flatter dayInstallers say 10 to 20 percent more (EvoEnergy) or about 10 (R&B). PVGIS for central England: about 1 percent more than a south-facing 30 degree roof, 11 percent more than south-facing frames at 10 degrees, 21 percent more than east-west arrays at 10 degreesEvoEnergy 4; R&B 10; JRC PVGIS 13
LandNoneRoughly 2.5 to 4 acres per MWp (installer); a government example used about 20 acres for 3.6 MW, about 5.6 acres per MWEvoEnergy 4; DESNZ 5
ScaleCapped by roof areaCommercial ground mount generally starts around 250 kWp; scalable across available landEvoEnergy 4
ProgrammeFaster on site12 to 30 weeks including groundworks, before any planning applicationEvoEnergy 4
ExtrasStructural survey and work at height with edge protectionFoundations, fencing, CCTV, an access track and a longer cable runEvoEnergy 4

The land figures differ because the sources describe different projects. The government example is one 2013 utility-scale scheme on moderate-quality agricultural land, and the arithmetic is ours. The installer figure is for commercial ground mount. Ask each installer how much land its design uses, not a rule of thumb. For the price band that sits under these percentages, see how much commercial solar costs in the UK.

Does the mounting method change business rates and tax?

The capital allowances are the same for both options, but business rates are not, because the exemption covers the solar plant while the land holding a ground array stays rateable.

In England, the Valuation Office Agency says plant and machinery that generates renewable power is excepted from rateability from 1 April 2022 to 1 April 2035 where the majority of the power is consumed within the property. It also says the land and settings accommodating the plant remain rateable. On installations of less than about 50 kW the residual value is likely to be minor, and above 50 kW a value has to be calculated to reflect the residual elements 6. A roof array sits on a building that is already rated. A ground array adds its own land and settings to the rating question, so ask your accountant or the VOA how your site would be treated.

Capital allowances do not depend on the mounting method. Companies can claim the Annual Investment Allowance of £1 million, and a 50 percent first-year allowance applies to solar as special rate plant, not full expensing 8. Confirm every tax point with your accountant. Our funding guide covers the routes.

Which option suits which site?

Roof suits a site with a sound, unshaded roof and little spare land, ground suits a site with surplus land and more demand than the roof can serve, and a car park canopy suits a site with parking and a weak roof.

This is a general guide from the sources above, not a design. Your half-hourly data and a structural survey decide.

Which mounting option suits which site
OptionSuitsWatch for
RoofA structurally sound, unshaded roof, no spare land, daytime demand close to the size of the roof arrayRoof age, structural capacity and lease term; work at height
GroundSurplus land, optimal orientation wanted, a need for more capacity than the roof can takeA full planning application, land quality, groundworks, fencing and a longer cable run, and rates on the land
Car park canopyA site with off-street parking where the roof is weak or short of spacePermitted development limits for height and distance from dwellings; the structure is a build in its own right

One installer notes that most urban and industrial estate sites have no genuinely spare land, which settles the question before cost enters the discussion 4.

Illustrative arithmetic, not a quote

A 500 kWp site: what the installer percentages imply

Take the public installed range for 500 kWp of £700 to £960 per kWp 9, as the rooftop price. Spirit Energy does not say whether this includes VAT. For 500 kWp that is £350,000 to £480,000. If a ground mount costs 15 to 30 percent more per kWp 410, the same size costs about £402,500 at the cheapest end and up to £624,000 at the dearest. On a mid-range £400,000 roof, that is about £60,000 to £120,000 more. Both ends of each range are installer figures, so use this only to see the scale of the gap.

Land at 2.5 to 4 acres per MWp 4 is 1.25 to 2 acres for 500 kWp. At the government example's 5.6 acres per MW 5, it is about 2.8 acres. The ground array could also generate more per kWp, about 10 to 20 percent on installer figures 410, which narrows the cost gap per kWh. None of these figures is a CH Group price or a prediction for your site.

Your next steps

  1. Measure your daytime demand Ask your electricity supplier for twelve months of half-hourly data. The size of the array should follow your demand, not the size of the roof or the field.

  2. Check what the roof can carry Ask for a roof condition and structural check, and confirm who owns or controls the roof. See the site suitability guide.

  3. Note what land you can spare Mark any land you do not otherwise use, and what it was used for before, since planning policy prefers previously developed land.

  4. Ask each installer to price both Where both are possible, ask for the land and planning assumptions, the programme including groundworks, and the rates position in writing.

How CH Group handles this

Choosing between roof and ground is part of defining the project. Our energy assessment reviews your bills, half-hourly data, operating hours and site, and project definition sets site constraints, objectives, target system and funding route. One consistent brief then goes to selected, vetted EPC partners, and every proposal is compared on the same ten variables.

Our fee is agreed in writing before you commit to anything, and installer partners also pay CH Group. Savings are projected, and we do not give regulated financial or tax advice. If the tender says you should not proceed, that is the recommendation.

To see a first indication for your site, try the savings calculator. When you are ready, book a call.

Questions buyers ask next

Is rooftop solar cheaper than a ground mount?

Per kWp, usually yes. Four unrelated installers put the ground-mount premium at 10 to 35 percent: 15 to 30 (EvoEnergy), 15 to 20 (R&B), 10 to 20 (Midland Solar) and 15 to 35 (Greener Solar Solutions). The reasons given are groundworks, fencing, trenching and access tracks, and EvoEnergy says the gap narrows at larger scale.

Do I need planning permission for ground-mounted solar for my business?

In England, almost always. An installer says in almost all commercial cases a full application is needed, and only the first stand-alone array in the grounds of a non-domestic building is permitted development, limited to 9 square metres. Check with your local planning authority.

How much land does a commercial ground mount need?

Sources differ. One installer says roughly 2.5 to 4 acres per MWp. A government case study describes 3.6 MW on about 20 acres, which is about 5.6 acres per MW. Ask each installer for the land its design uses.

Is a ground-mounted array more efficient than a roof array?

The panels are the same. Installers say a ground array usually generates about 10 to 20 percent more per kWp because tilt and orientation are chosen, not set by the roof. The European Commission's PVGIS tool shows the gain depends on the roof: for central England, about 1 percent against a south-facing 30 degree pitched roof and about 21 percent against east-west arrays at 10 degrees.

Can I put solar over my car park?

A solar canopy over off-street parking can be permitted development in England within limits, including a 4 m height limit and more than 10 m from the curtilage of a dwelling or block of flats. It is a structure in its own right, so ask installers to price it separately.

Does a ground-mounted array pay business rates?

In England the plant is excepted from rateability where most of the power is used on site, until 1 April 2035, but the land that holds it stays rateable. Ask your accountant or the VOA how your site would be treated.

Sources

Public figures are from the sources below, as published on the dates shown. CH Group project figures are projections supplied for each case study. This guide is general information, not financial, tax or legal advice.

  1. Planning Portal, Planning Permission: Stand alone solar panel installations in the grounds of a non-domestic building, Accessed 16 Nov 2026.
  2. Planning Portal, Planning Permission: Solar panels mounted on a non-domestic building, Accessed 16 Nov 2026.
  3. Planning Portal, Planning Permission: Installation of a solar canopy on non-domestic off-street parking, Accessed 16 Nov 2026.
  4. EvoEnergy, Rooftop vs Ground Mounted Solar PV System: UK Business Guide, Published 29 Aug 2026, updated 13 Oct 2026.
  5. DESNZ, Solar roadmap: United Kingdom powered by solar, 30 Jun 2025.
  6. VOA / GOV.UK, Rating Manual section 5a: Power generators, Updated 6 Nov 2026.
  7. SSEN, Metered Connections GSoPs (performance standards 2026), April 2026.
  8. HMRC, Capital allowances and balancing charges (HS252), 2025, 6 Apr 2026.
  9. Spirit Energy, Commercial solar cost, payback and ROI, 2026.
  10. R&B Mechanical & Electrical, Will the cost of commercial solar in the UK decrease in 2026, Published 20 Dec 2025.
  11. Midland Solar, Ground Mounted Solar Panels: Complete UK Guide, Accessed 16 Nov 2026.
  12. Greener Solar Solutions, Ground Mounted Solar Panels UK: Cost and Planning 2026, Published 22 Sep 2026, updated 22 Oct 2026.
  13. European Commission Joint Research Centre, PVGIS photovoltaic geographical information system (PVcalc, 1 kWp, 14% losses, SARAH3 2005 to 2023, 52.48 N 1.90 W), Calculation run 16 Nov 2026.

Let's look at your site.

A short call with Harry or James. We get to know your site, energy use and objectives, and show you how a structured tender would work for you.

  1. Initial review We get to know your site, energy use and objectives.

  2. Energy assessment We analyse your energy data and solar potential.

  3. Structured tender Our vetted EPC partners compete for your project, and we give you a clear recommendation.

Book a call

Opens Calendly in a new tab.

Prefer to talk now? Call Harry on +44 7488 893313.